Ponda: With around 50%deal with 11kV lines and 20%deal with low stress (LT) domestic power lines total, govt has actually set its sights on finishing the moving of 11kV lines throughout the state and LT lines in metropolitan locations underground before the 2027 assembly elections.Power minister Ramkrishna ‘Sudin’ Dhavalikar informed press reporters on the sidelines of a program at Ponda just recently that govt would move the lines underground.Each electrical feeder currently has actually 18-20 transformers connected to it, and if even one transformer establishes any sort of a snag, supply to all lines connected to the feeder needs to be shut.“But when the cable televisions hole up, just a specific transformer would be shut to attend to the issue. This will keep the staying transformers energized,” the minister described.There are no strategies for underground cabling of LT lines in rural locations, 100% underground cabling of metropolitan LT lines will be done before the elections, he stated.
